博文

目前显示的是 十月, 2022的博文

Xinyue Steel Support Australia jetty piling construction project

Project Location: Australia Product: LSAW steel pipe Specification: DN500 Standard & Grade: EN10219 S355JR Usage: Jetty piling construction Received the inquiry in Oct 2021. Signed the contract on May 2022 Estimated Shipping time: June, 2022 In last Oct, Xinyue received a new enquiry of LSAW steel pipes with Epoxy painting from our regular client for a small jetty piling construction to Australia. The enquiry is very complex, one OD pipe but with several different length and in total quantity only several piles & less than 50tons, also required heavy thickness Epoxy painting. After several months of bidding, design changes and price updates, the project finally made good progress in this February. The end user had verbally awarded the project to our client, but it still needs about several weeks to confirm the specific technical terms and contract details. Due to the chaos of global shipping in recent years, the congestion situation of various ports is very serious. As a result...

Thin wall steel pipe for fire fighting set sail again to Africa

Project location:Morocco Product:Seamless Steel Pipe Standard and material:DIN 2440 ST 33.2,DIN 2448/1629 ST 37.0 Specifications:21.3-508mm Usage:Fire System Inquiry time:2022.02.18 Order time:2022.03.04 Shipping time:2022.05.27 Estimated arrival time:2022.07.27 After Chinese New Year Holiday, Xinyue received procurement demand from a regular customer in Africa for thin-walled seamless steel tubes, the thickness is on or below sch 30, with some items in galvanizing and threaded. After two week negotiation, we have reached an agreement of cooperation. The key point for the thin-walled seamless steel tubes is the control of thickness , NDT and damage during transportation and loading. Xinyue insists to load the container in the mill to make sure the pipes arrive in good conditions. All the pipes has been passed inspection currently and really delivery to the destination. https://www.xysteelpipe.com/thin-wall-steel-pipe-for-fire-fighting-set-sail-again-to-africa/

European regular customer purchase alloy steel pipe from Xinyue again

Project Location:Germany Product:Welded Steel Pipe Standard and material:ASTM A691, ASME B31.3, SA387 Gr.11 Cl.2 Specifications:OD800-1100MM WT 16-50MM length in 1000-9000mm. Usage:Pressure Vessel Inquiry Time: Feb Of 2022 Order Time:Aug Of 2022 Shipping Time:Oct Of 2022 Estimated Arrival Time:Dec Of 2022 This is a continue purchasing order from my regular customer since 2018 year. The product with standard and steel grade as:ASTM A691, ASME B31.3, SA387 Gr.11 Cl.2 which is similar requirement with the purchasing order at 2019 year. The technical requirement is very complex and specify , for example: Ovality and diameter: acc. ASTM A691, Pipe Ends aspire to reach max. 3 mm Length: +3/-0 mm – Vacuum degassed and quenched or normalized and tempered – Tempering temp. min. 720°C -0°C/+20°C – J=(Si+Mn)x(P+Sn)x10000=max. 150 – %Mn+%Si=max. 1,25% – U.T. on plates acc. to SA 578 / Level B Max. 225 HBN also in the heat affected zone of weld # RT-Testing 100% acc. ASME Code Section V, Article 2 ...

How to do the anti-corrosion work of thick wall seamless pipe?

 The general application of thick-walled seamless tubes must do the corresponding anti-corrosion and anti-rust treatment work. The general anti-corrosion work is divided into three processes: 1. Anti-rust treatment of pipes. Before painting, the surface of the pipeline should be cleaned of oil, slag, rust, and zinc dust. The product quality standard is Sa2.5. 2. After the anti-rust treatment on the surface of the pipeline, apply topcoat, and the interval between them should not exceed 8 hours. When applying the topcoat, the base surface should be dry and the topcoat should be uniform, rounded and free of lumps and air bubbles. Both sides of the pipe shall not be brushed within the range of 150~250mm. 3. After the topcoat has dried and solidified, apply the paint and bundle the fiberglass cloth, and the interval between the topcoat and the paint should not exceed 24 hours. Cracking of thick-walled seamless steel tube: In the whole application process of thick-walled seamless steel t...

A inspection report sheet bring more trust

Project Location: UK Product: GI Tube and structural steel Specification:22mm to 60mm Standard:BS1387 Usage:Greenhouse structure Inquiry time: Feb, 2022 Sign time: Feb, 2022 Shipping time: May, 2022 Arrival time: July, 2022 British greenhouse steel structure product’s requirements are very high on galvanized layer, size and processing. Five items of products purchased by the customer this time are galvanized steel products, and the zinc layer required to be 40 microns thick to ensure the service life and safety of greenhouses. Each product has precise drawing requirements, strict tolerance range for dimensions, machining parameters, etc. Before shipment, we have done 100% inspection on all our products, including: appearance, galvanizing layer, processing size, packaging and so on. And We issued a comprehensive inspection report according to the actual inspection data . Customers are very satisfied with Xinyue’s quality control and service. Paid the balance in advance and communicated ...

Xinyue supply AISI 4145 thick wall seamless to Oman Oil Company

Project location:Oman Product:Seamless Pipe Standard and material:AISI 4145 Specifications:OD325XWT125MMX56000MM Usage:Drilling Process Inquiry time:April 29, 2022 Order time:May 13, 2022 Shipping time:June 10, 2022 Estimated arrival time:July 10, 2022 This cooperation is a new customer in the Middle East. The customer got to know Xinyue Company through foreign exhibitions. The first inquiry of pipe ,AISI4145 OD325XWT125MMX56000MM , quantity is only one, which will be supplied to Petroleum Developer Of Oman for drilling pipe processing. The customer specially attaches the technical requirements, compared with the standard requirements, the customer’s technical requirements are higher than one. Xinyue have took advantage of the steel pipe market for many years, integrates resources, actively helps customers find solutions, integrates the chemical composition and mechanical properties of raw materials, and meets customer heat treatment requirements , propose the optimal solution to his c...

Surface roughness of carbon steel pipe

 The surface roughness of carbon steel pipe refers to the small spacing and the unevenness of small peaks and valleys on the machined surface. The distance (wave pitch) between the two wave crests or two wave troughs is very small (below 1mm), which belongs to the micro-geometric error. The smaller the surface roughness of the carbon steel pipe, the smoother the surface. The surface roughness of carbon steel pipe is generally formed by the processing method and other factors, such as the friction between the tool and the surface of the part during processing, the plastic deformation of the surface metal when the chips are separated, and the high-frequency vibration in the process system, etc. . Due to different processing methods and workpiece materials, the depth, density, shape and texture of marks left on the machined surface are different. Surface roughness is closely related to the matching properties, wear resistance, fatigue strength, contact stiffness, vibration and noise o...

Test Method for Heat Treatment Hardness of Seamless Steel Tubes

Surface heat treatment is divided into two categories: one is surface quenching and tempering heat treatment, and the other is chemical heat treatment. Common hardness testing methods are as follows: 1. Surface quenching and tempering heat treatment The surface quenching and tempering heat treatment of seamless steel pipes is usually carried out by induction heating or flame heating. The main technical parameters are surface hardness, local hardness and effective hardened layer depth. Vickers hardness tester can be used for hardness testing, Rockwell or surface Rockwell hardness tester can also be used. The selection of the test force (scale) is related to the depth of the effective hardened layer and the surface hardness of the straight seam welded pipe. There are three durometers involved here. 1) Vickers hardness tester Vickers hardness tester is an important means to test the surface hardness of heat-treated seamless pipes. It can use a test force of 0.5-100kg to test the surface h...

Xinyue steel support hot water and heating supply system project in Bangladesh

The order project to be introduced today the project is used in Bangladesh, which is the first cooperation between Xinyue and customers. The products mainly include seamless steel pipes, pipe fittings and thermal insulation layer. Material:ASTM A106 Specification:273mm*9.27mm*6m Usage:hot water and heating supply system project Timeline: Received the inquire on Nov,2021 Signed the contract on Nov,2021 Delivery time in beginning of Jan,2022. Estimated time of arrival in the early Feb,2022. Project service time: April 2022 This is the first time for the customer to seek a steel pipe supplier in China. After receiving the inquiry from the customer, Xinyue submitted all the technical documents at the first time. Strict quality control assured the customer to hand over the order to Xinyue. The shipment time was just the end of last year. Faced with the serious problem of cargo accumulation at the port, the customer also put forward the fastest shipping requirements. Xinyue actively coordina...

Xinyue Successfully support west Africa pipeline project

Project location: SENEGAL Product:LSAW Steel pipe Standard and material:EN10219-1 S355K2 Specifications:1220X12X8000MM 1220X22X8000MM Usage:water transmission Inquiry time:2022.03.22 Order time:2022.04.06 Shipping time:2022.06 Estimated arrival time:2022.07.15 This is an order from an regular customer, which is mainly used for water transmission project for West African. When receiving the inquiry, the customer asked for spiral steel pipe, but because we can not book the raw material with such steel grade, finally customer agreed to change into LSAW after our suggestion. we provided relevant technical documents, delivery plan and shipping date along with our quotation. Based on the trust of our previous cooperation orders, the customer award this project to Xinyue. This batch of orders have arrived as scheduled. At present, the self-test is qualified. Next, we will arrange production as schedule and deliver on time. https://www.xysteelpipe.com/xinyue-successfully-support-west-africa-pi...