LR approved steel pipe and fitting support Thailand Marine Industry

Project location:Thailand Product:Carbon Steel / Stainless Steel Seamless Steel Pipe; Carbon Steel/ Stainless Steel fittings; Standard and material:ASTM A53 GR.B/ ASTM A312 TP316L/ ASME B16.9 Specifications:DN20 – DN250 SCH40/SCH80 Usage:Marine/ shipyard industry Inquiry time:2022.04.29 Order time:2022.05.11 Shipping time:2022.07.20 Estimated arrival time:2022.8 At the end of April 2022, Tianjin Xinyue received an inquiry for steel pipes and fittings from a new customer in Thailand recommended by an regular customer in Singapore. The whole order is 140 items, including three major products: carbon steel pipes, stainless steel pipes and fittings, with the following standards and materials: Seamless Carbon Steel pipes ASTM A53 gr.b, seamless stainless steel pipes ASTM A312 TP316L, carbon steel pipe fittings and stainless steel pipe fittings, ASME b16.9, diameter range: DN10 – DN250, wall thickness range SCH 5- SCH80, length of 6 meters in fixed length, total 13 tons. All of the products ...

Xinyue Support Vietnam Power Plant Project

Project Location: Vietnam Products: STEEL PIPE AND FITTINGS Size: 1/2“-16 Standard: JASTM A234 WPB, ASTM A403 F304 etc Application: power plant construction Inquiry time:10th Mat, 2022 Purchase time: 17th May, 2022 Estimated Shipping time: 31 July, 2022 Estimated Arrival time: 14 August, 2022 This order is over ten tons in total, but includes a total of 151 specifications of seamless steel pipe/welded steel pipe /pipe fitting/flange and stainless steel seamless pipe/galvanized pipe/carbon steel fitting/carbon steel flange etc. From request for quotation, project structure drawings, daily production reports, inspection, storage, shipment, etc., the customer strictly requires detailed documentary support and reports, which need to be sent to the customer for review at the specified time before proceeding to the next step. After detailed confirmation of details, the two sides reached cooperation on May 17. During the period, we gave the customer 7 drawings of specified elbows and orifice ...

Seamless Steel Tube Billet

The billet used in the production of steel pipes is called tube billet. Usually high-quality (or alloy) solid round steel is used as the tube billet. According to different production methods, carbon steel seamless tubes have billets made of steel ingots, continuous casting billets, forging billets, rolled billets and centrifugally cast hollow billets.Since the quality of the tube billet largely determines the quality of the seamless steel tube, the preparation of the tube billet is particularly important. In general, the tube blank refers to a round tube billet. The size of the round tube billet is represented by the diameter of the solid round steel. Tube billet preparation includes selection of tube billet model and specification, chemical composition and structure inspection, surface defect inspection and cleaning, cutting, centering, etc. Production process of seamless steel tube billet is as follows: Ironmaking - Steelmaking - Open Hearth Steel (or Electric Furnace Steel and Oxyg...

Xinyue Serves Chilean Government Bridge Construction Project

Project Location:Chile Products:LSAW steel pipe with welding shoes Size: 800*18*12000mm 800*18*13000 mm Standard and steel grade:ASTM A252 ASTM A572 GR. 50 Coating requirement: Bare Pipe Application:Bridge Construction Inquiry Time: April 2022 Purchase Time:May, 2022 Shipped Time:July, 2022 This order is a regular customer in Chile, and it is a pile pipe order from a construction company, and the end user is a public government project in Chile. Due to the cooperation between Xinyue and the customer in the past, Xinyue’s quality, delivery and service were excellent, and the purchase speed was very fast in this order, and it only took 1 month from the inquiry to the transaction. At the beginning of the quotation, we provided several design solutions for the customer, with the sea transportation method, to maximize the customer’s procurement solution, the lowest procurement cost and the fastest delivery time, so as to seize the procurement right from the terminal together with the custom...

Give best solution to our customer

Project location:Kazakhstan Product:seamless steel pipe Standard and material:GOST 8732-78 Specifications:32-325MM Application:gas transportation Inquiry time:2022.07.01 Order time:2022.07.14 Shipping time:2022.09 Estimated arrival time:2022.10 This order comes from Central Asia, a regular customer of our company. Because the customer’s country is located in the middle of Asia is a landlocked country, so we take the way of internal transportation by train. However, the customer informed us that the delivery date is urgent and the product will be used immediately in the near future. In order to solve this problem, the company immediately got along with the emergency plan, the steel pipe already produced in the early stage will go by truck, and the remaining part will continue to go by wagon, so as to solve the problem of urgent delivery date of the customer and ensure the smooth start of the customer’s project. https://www.xysteelpipe.com/give-best-solution-to-our-customer/

Xinyue seamless pipes help build church infrastructure in India

Project Location:India Product:Seamless Steel Pipe Standard and material:GB/T 8163 Specifications:Q345B Usage:Infrastructure Construction Inquiry time: June of 2021 Order time:Aug of 2022 Shipping time:Sep of 2022 Estimated arrival time:Oct of 2022 The Indian client is a church builder. The client contacted us in the middle of last year. But no purchase order was confirmed. I contacted the customer on August 19 this year, and the customer asked to update the price scheme. After updating the price, I found that there are many people asking about this order in the market. We have many competitors. Knowing that the customer was in a hurry about the delivery date, I used the company’s resources and integration to find the spot plan to the customer, and at the same time sent the customer a photo of the spot. The customer is willing to cooperate. However, the client was very cautious because it was the first time to cooperate with our company. From August 20 to August 22, I successively solv...

Seamless steel tubes for fluid transportation

Fluid seamless steel pipe is a kind of steel pipe used for fluid transportation. A seamless steel pipe for fluid (fluid pipe) is a steel pipe with a hollow section and no welds from the beginning to the end. It is mainly used for conveying fluid pipelines in engineering and large-scale equipment. Fluid seamless pipe production process: Round tube billet→heating→piercing→three-roll skew rolling, continuous rolling or extrusion→tube removal→sizing (or reducing)→cooling→billet tube→straightening→hydraulic test (or flaw detection)→marking→warehousing . Due to its low cost and high strength, fluid seamless pipes are widely used in fluid transportation in modern society. The fluid seamless pipe can also carry out anti-corrosion and thermal insulation treatment on the surface according to the needs of use conditions and actual construction conditions. The length of the fluid seamless pipe can be made according to the needs of customers, the general length is between 6 and 12 meters, and the e...

Submerged Arc Welding – the Most Practical Steel Pipe Welding Technology

Submerged arc welding (SAW) is one of the most efficient mechanized welding methods today. Its full name is automatic submerged arc welding, also known as automatic arc welding under the flux layer. Submerged arc welding technology is ideal for important applications such as pipelines, pressure vessels and storage tanks, rail manufacturing and large-scale construction. Available in the simplest form of single wire, double wire construction , series double-filament structure, multi-filament structure. Submerged arc welding technology can benefit users in many welding applications. From increasing productivity to improving the working environment to ensuring consistent quality and more. Metal fabricators who are considering making changes to the submerged arc welding process should be thinking that there are many benefits to be gained from the process. Advantages of submerged arc welding: Submerged arc welding (SAW) technology is suitable for heavy industrial applications such as pipelin...

Pipe and fitting order for Middle East Customer finished per production schedule

Project Location: Middle East Product: steel pipe and pipe fittings Material: ASTM A312 Gr.TP 316L、ASTM A106 GRADE B、A234 WPB、ASTM A105N、S A182 316/L、BRASS C3604BD Size: 33.4-323.9mm-2.77-25.4mm*6000mm/1/2inch-10inch Usage:used for the vessel repair jobs Received the inquiry on March, 2022 Signed the contract on May, 2022 Delivery time:September, 2022 This order is the second and third order of this year. This batch of orders includes carbon steel pipes, stainless steel pipes and pipe fittings. The specifications are quite disordered. In order to ensure the smooth operation of the order, Xinyue held a kick off meeting before production to ensure that each specification and size are fully implemented in accordance with the customer’s contract. The customer has not arranged a third party inspection for this order. However, in order to ensure that the quality is fully in accordance with the customer’s requirements, Xinyue not only has the inspectors of the quality inspection department in...

Thinking what customers want and need

Project location:Guyana Product:SSAW Steel Pipe Standard and material:ASTM A252 GR 2 Specifications:20” Usage:Steel Piling Inquiry time:2022.06.29 Order time:2022.08.10 Shipping time:2022.09.05 Estimated arrival time:2022.10.20 This contract is the project material purchasing of Xinyue’s long-term cooperative customer. On the day of receiving the inquiry, the customer has emphasized that the delivery date is very important and must be delivered within 2 weeks. In consideration with the actual production situation, Xinyue has recommended customer the suitable wall thickness which can be rolled and delivered faster and reached an agreement. The payment term for this order is L / C which takes around 7 to 10 working days for customer to issue it. If Xinyue start the production against the LC , the delivery date of the project will be delayed. Based on the trust of long-term cooperation between both parties and the interests of customers, Xinyue arranged the purchase of raw materials the d...