Manufacturing Process of Carbon Seamless Steel Pipe

    According to different production methods, seamless steel pipe can be divided into hot rolling pipe, cold rolling pipe, drawing tube, extrusion tube.

    1.Hot-rolled seamless pipe is generally in the automatic production of rolling mill unit. The solid tube blank is inspected and removed from the surface defects, cut into the required length, in the tube end of the perforation end of the centering, and then sent to the heating furnace heating, perforation in the punching machine. In the perforation at the same time continue to rotate and move, in the role of the roll and the head, the tube gradually formed within the cavity, called the capillary. And then sent to the automatic rolling machine to continue rolling. And finally by the whole machine are the whole wall thickness, by sizing machine diameter, to specifications. The use of continuous rolling mill production of hot-rolled seamless steel pipe is a more advanced method.

    2.If you want to get smaller and better quality of seamless tubes, must be cold-rolled, cold drawn or a combination of the two methods. Cold rolling is usually carried out on a two-roll mill, in which the steel pipe is rolled in an annular orifice formed by a tapered hole and a non-moving tapered head. Cold drawing is usually carried out on single-chain or double-chain cold drawing machines of 0.5 to 100T.

    3.the extrusion method is to heat a good tube on a closed cylinder, squeeze rods and extrusion rod with the movement, so that extrusion from the smaller hole in the extrusion die. This method can produce smaller diameter steel pipe.

评论

此博客中的热门博文

What are the lead times and logistics capabilities of the supplier?

How competitive are the prices of the steel pipes?

Xinyue Steel Group Strengthens Its Presence in Southeast Asia